Solar Mandatory for Bldgs in Haryana. Will it Work?  
(  22    0 )
votedemo
 
X
Loading........
Description

Solar Mandatory for Bldgs in Haryana. Will it Work?


The Haryana government recently announced that it will be mandatory for all buildings on plot size of 500 square yards or more to install rooftop solar power systems by September 2015.


The order will be applicable to private bungalows, group housing societies, builder apartments, malls, offices, commercial complexes, schools, hospitals — any building, new or old, that meets the plot size criteria.


The government had offered a 30% subsidy on installation costs on “a first-come-first-served” basis. This subsidy may now be reduced to 15%, as per the latest reports, based on the announcements from MNRE.


The minimum solar power capacity to be installed is 1 kilo Watt or 5% of a building’s connected load, whichever is higher. Failure to install the solar panels by September would attract penalties between Rs 10,000 and Rs 10 lakh, officials said.


Meanwhile, the State is also working out the modalities of connecting rooftop panels with the power grid, through the net-metering system.


So what does it mean for India’s Solar Industry?


From outside, this seems to be good news for India’s solar industry; creating a new market for the industry.


Some points to be noted:


1. Does the State think that such a short term push will help develop the solar infrastructure in the State? This short deadline may also encourage fly-by-night operators. Maybe the State could have prepared a list of authorized solar vendors/epc/installers; keeping a kind of confidence to the customers.


2. 15%-30% subsidy sounds good on paper. On the ground, it will just add another paper-work and admin burden on either the end user or the installer [Either the end user will apply for subsidy themselves or the installer will take on itself the task of applying for subsidy]. Also the “first-cum-first serve” basis may only add to unethical practices.


If the end-customer has to take the responsibility of the subsidy; then it will create a new market for agents/in-between players who will assist these solar owners to get subsidy from the government.


The State can also look at direct tax incentives for solar installations.


3. Net-metering clause will also bring in other challenges. Rate at which discoms buy additional power needs to be analysed. Also to solve technical challenges, the State could have initiated net-metering demo projects on government buildings.


4. The State is looking at a target of 50MW. But pushing such targets or clauses on the end -customer makes me little uncomfortable. Yes, the policy can make it mandatory for new buildings or government buildings, but then pushing private companies/families into this suddenly can create an uncomfortable environment.


5. What steps are to be taken if there is not enough space to put the solar plant in the building? What happens when the solar plant is not feasible for that particular building?


For now, an education drive will be useful to help people understand the process of buying/installing a solar power plant.


This also shows how important is energy security for States. We may see more such push from other State Governments. But I hope it is better planned and implemented.

Posted By    Admin  |   (Posted 2 years ago)..   |   City : Delhi
 
Total Comments (0)
No Comment Yet!
Add Comment
Name *
Company Name 
E-mail *
Designation 
Comment *
Security Code

Enter the code shown above in the box below

 
 
SYNERGY MAXX TECHNOLOGY
# H4/47B, UGF,MAHAVIR ENCLAVE
DELHI, INDIA,110045
E-MAIL: rk@synergymaxx.com
Tel: +91-11-25044623
Mobile: +91 9968857965
 
Most Popular Blogs
Rooftop solar powers past new milestone
More than 3 gigawatts of solar power has now been installed on Australian rooftops, which will produce enough energy over the nex...View More
 2013, Dec Sun  by ‘‘Solarneed’’
Accenture To Help Azure Power Expand Its Solar Generation Business
Accenture has been selected by Azure Power, India’s leading independent solar power producer, to implement an SAP&re...View More
 2014, Apr Fri  by ‘‘Admin’’
India likely to impose steep Dumping Duty on Solar Gear Importers
India is likely to impose a steep duty on importers of solar cells following vociferous complaints from domestic manufactu...View More
 2014, May Tue  by ‘‘Admin’’
Solar energy ambitions take shape as costs tumble
Solar energy ambitions take shape as costs tumble
Written by Akshata
View More
 2014, Feb Sun  by ‘‘Admin’’
 
Latest News
Installation of 2Kw rooftop with Battery bank in Gurgaon
Synergy Maxx team has installed it 2Kw rooftop system in Sushant Lok-2,Gurgaon we are executing next 5KW and 10KW project in Gurgaon soon.

Commissioning of 2KW and 10KW solar System In Haryana
Synergymaxx team is commissioning one 2Kw rooftop system and second 10KW rooftop in Haryana.

JA Solar has signed an MOU with Essel Infraproject Ltd
JA Solar has signed an MOU (memorandum of understanding) with Essel Infraproject Ltd (EIL) in India for a JV solar cell and module manufacturing plant in India. Essel Infraproject is the PV project and infrastructure arm of Essel Group.

Haryana makes solar power must for all buildings
The Haryana government has decided to usher in the New Year with one of the biggest pushes for solar power in the country. The state has made it mandatory for all buildings on plot size of 500 square yards or more to install rooftop solar power systems by

Synergymaxx New Installation 1Kw solar Roof top
Synergymaxx has installed 1kw Solar rooftop system with battery backup in Bijnor where electricity cut is for 6-8 hours. we are working towards our goal to enlighten future of next Generation.

Home     About Us     Contact Us     Top Blogs   ABC's Of Solar
Copyright © 2013-14